Building
Future
Together
Smarter
Beyond
Project Name
Due Date
Description
Action
HWDSB - Franklin Road Music Room and Washroom Project
Active
The project at Franklin Road Elementary School, Hamilton, ON, involves renovating the music room,
corridors, and nine student/staff washrooms. Scope includes installing acoustic ceilings, LED
lighting, ceramic tile finishes (1,800 mm high), plumbing upgrades, asbestos abatement (e.g.,
transite ceiling tiles), and mechanical/electrical system coordination (fire alarms, CAT6 cabling).
Work is phased over three stages (June 2025–April 2026), with strict adherence to safety protocols,
and pre-qualified subcontractors (abatement, data cabling).
HWDSB - Lisgar Music Room and Exterior Door Project
Active
The project involves the renovation of the music room and replacement of exterior doors at Lisgar
Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of
two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with
deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and
hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025),
adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV,
and data cabling.
Colliers - Watermain and Piping
Active
The project involves the renovation of the music room and replacement of exterior doors at Lisgar
Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of
two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with
deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and
hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025),
adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV,
and data cabling.
Walmart RTU - Grand-Sault, NB
Active
Replacement of rooftop units at the Walmart store located at 494 Chem. Madawaska, Grand-Sault, NB
E3Y 1A3. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs
to be completed after store hours.
Walmart RTU - Antigonish, NS
Active
Replacement of rooftop units at the Walmart store located at 50 Market St, Antigonish, NS B2G 3B4.
Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
Walmart RTU - Gatineau, QC
Active
Replacement of rooftop units at the Walmart store located at 425 Boulevard Saint-Joseph #1,
Gatineau, QC J8Y 3Z9. Project is set to begin sometime in May/June 2025 and end on July/August 2025.
Work needs to be completed after store hours.
Walmart RTU - Quebec City, QC
Active
Replacement of rooftop units at the Walmart store located at 1700 Bd Lebourgneuf, Québec, QC G2K
2M4. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
Walmart RTU - Edmonton, AB
Active
Replacement of rooftop units at the Walmart store located at Northgate Center, 9499 137 Ave NW,
Edmonton, AB T5E 5R8. Project is set to begin sometime in May/June 2025 and end on July/August 2025.
Work needs to be completed after store hours.
Walmart RTU - Selkirk, MB
Active
Replacement of rooftop units at the Walmart store located at 1016 Manitoba Ave, Selkirk, MB R1A 4M1.
Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
Walmart RTU - Powell River, BC
Active
Replacement of rooftop units at the Walmart store located at 1. 7100 Alberni St, Powell River, BC
V8A 3G7. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs
to be completed after store hours.
Thales Palladium
Active
Thales is looking to consolidate its footprint in Ottawa where it currently has three leases across
two addresses, Thales has leased 500 Palladium Dr. for this purpose. Thales is intending to complete
tenant improvements of the new space improving the facilities for all of Thales employees in the
National Capital region. The general contractor will conduct fit-out will comprise of demolition,
engineered structure re-enforcements, partition construction, environmental upgrades, supply of all
materials, and finishing of the 2-story floor space.
Walmart - 1068 Peace River Perimeter Fencing Project
Active
Chainlink fencing required for the Walmart store located at 9701 78 St, Peace River, AB T8S 2A1.
HWDSB - Westdale Secondary School Changeroom Renovation
Active
Renovation of changerooms at Westdale Secondary School at 700 Main St W, Hamilton, ON L8S
1A5. The project involves constructing two student group changerooms, three single-occupant
changerooms, and a staff room in the basement, along with related mechanical, electrical,
and structural work, including demolition, plumbing, and finishes. Key milestones include a
site walkthrough on April 3, 2025, tender submission by April 15, 2025, and construction
from June 30 to December 12, 2025.
Walmart - 1025 Matane - Exterior Painting
Active
Exterior painting project located at 150 Rue Piuze, Matane, QC G4W 4T2. The work
includes exterior painting, signage replacement (supplied by Pattison ID), roof cap
flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco canopy
above the main entrance to be done after store hours.
Walmart - 1028 Drumheller - Exterior Painting
Active
Exterior painting project located at 1801 S Railway Ave, Drumheller, AB T0J 0Y0. The
work includes exterior painting, signage replacement (supplied by Pattison ID), roof
cap flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco
canopy above the main entrance to be done after store hours.
Peel Living - Interior Renovations at Various Peel Living Residential Properties
Active
Project involves the interior renovations of three residential properties (Bella
Vista Place, Mason’s Landing, and Walker Road). The scope includes renovating
common areas such as lobbies, corridors, stairwells, and garbage rooms by
replacing flooring and wall tiles, repainting surfaces, installing signage, and
addressing potential asbestos/mold abatement. Substantial completion by January
31, 2026, and final completion by May 31, 2026.
UofT - Upper Burwash WR - PH1 Middle House WR Reno
Active
"This project consists of the Retrofit, Renewal and Renovations of 18 Washrooms at the Basement and 3 upper levels in the Upper Burwash Residences, Middle House located at 73 Queen's Park Cres E, Toronto, ON.
The work is intended to commence in the 4th week of May 2025 and be completed, ready for full Occupancy, by August 7, 2025 ."
WRHN - Waterloo Regional Parking Lot
Active
This project involves the expansion of the existing parking lot at the Chicopee Campus (formerly GRH Freeport) in 3570 King St E, Kitchener, ON N2A 2W6.
The project requires phased construction to maintain two access lanes and limit payment booth downtime to two weeks, with strict adherence to a milestone schedule targeting substantial completion by September 8, 2025.
Peel Living - Ceiling and Lighting Replacement - Castle Brooke
Active
The project involves the comprehensive replacement of existing ceiling tiles and lighting systems at Castelbrooke (2590 Rugby Road, Mississauga), including demolition of suspended metal grids and acoustical tiles in specified areas (basement, ground floor, levels 2–10, and level 11), installation of new Armstrong Calla ceiling tiles with Prelude XL grid systems, and upgrading lighting fixtures while reusing existing electrical circuits. Work includes relocating salvaged fixtures to designated mechanical/electrical rooms, adding mid-landing stair lighting, reinstating fire-rated assemblies with compliant fire-stopping materials, and repainting affected surfaces.
The project requires substantial completion by June 9, 2025, final completion by June 16, 2025,
The project requires substantial completion by June 9, 2025, final completion by June 16, 2025,
Walmart - 3122 Belleville - Washroom Replacement
Active
Washroom renovation of the Walmart store located at 274 Millennium Pkwy, Belleville, ON K8N 4Z5. Scope of work includes demolition, drywall, electrical, flooring, tiles, millwork, painting, and plumbing.
Commencement sometime on May 2025 with a substantial completion on July 11, 2025.
Commencement sometime on May 2025 with a substantial completion on July 11, 2025.
HWDSB - Hess Street Elementary Floor and RTU
Closed
Project description...
HWDSB - Lisgar Elen School Music Rm Reno & Exterior Door Replacement
Closed
Project description...
(GWNCC) Haldimand County - replace and Repair Concrete Curb, Sidewalk and
Catchbasiins
Closed
Project description...
Cavalieri -Self Storage - 7845 Hwy 27 Phase 2
Closed
Project description...
Walmart - FY26 Parking Lot (ON)
Closed
Project description...
GTAA Project 14062 New Offices
Closed
Project description...