FORGE THE FUTURE WITH US
Your premier gateway to significant tender opportunities. We are seeking elite subcontractors.
0
Completed Projects
A testament to our reliability and expertise in delivering excellence on time and on budget.
0
Years of Leadership
Decades of experience navigating the complexities of construction, ensuring stability and deep-rooted knowledge.
0
Valued Partnerships
Join a vast network built on mutual respect, trust, and a shared commitment to quality.
CURRENT TENDER OPPORTUNITIES
Building
Future
Together
Smarter
Beyond
Project Name
Due Date
Description
Action
HWDSB - Franklin Road Music Room and Washroom Project
Active
The project at Franklin Road Elementary School, Hamilton, ON, involves renovating the music room,
corridors, and nine student/staff washrooms. Scope includes installing acoustic ceilings, LED
lighting, ceramic tile finishes (1,800 mm high), plumbing upgrades, asbestos abatement (e.g.,
transite ceiling tiles), and mechanical/electrical system coordination (fire alarms, CAT6 cabling).
Work is phased over three stages (June 2025–April 2026), with strict adherence to safety protocols,
and pre-qualified subcontractors (abatement, data cabling).
HWDSB - Lisgar Music Room and Exterior Door Project
Active
The project involves the renovation of the music room and replacement of exterior doors at Lisgar
Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of
two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with
deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and
hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025),
adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV,
and data cabling.
Walmart OMNI 1149 & 3076, Edmonton AB, Regina SK
Active
Renovations of the OMNI section of two Walmart stores at Alberta and Saskatchewan. Scope of work includes replacement of refrigeration cases, selective demolition, and flooring replacement.
1) 87 Ave NW, Edmonton, AB T5R 5W9
2) 3939 Rochdale Blvd, Regina, SK S4X 4P7
1) 87 Ave NW, Edmonton, AB T5R 5W9
2) 3939 Rochdale Blvd, Regina, SK S4X 4P7
Colliers - Watermain and Piping
Active
The project involves the renovation of the music room and replacement of exterior doors at Lisgar
Elementary School (110 Anson Avenue, Hamilton, ON). Scope includes demolition and installation of
two sets of double HM doors (D6/D7), music room upgrades (new flooring, LED lighting, millwork with
deep sink, instrument storage, painting, teaching wall, plumbing fixtures, and cooling units), and
hazardous material abatement. Work must comply with strict timelines (June 30 – August 22, 2025),
adhere to City of Hamilton noise bylaws, and utilize pre-qualified subcontractors for abatement, AV,
and data cabling.
Walmart RTU - Grand-Sault, NB
Active
Replacement of rooftop units at the Walmart store located at 494 Chem. Madawaska, Grand-Sault, NB
E3Y 1A3. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs
to be completed after store hours.
Sole Point - 1020 Johnsons Ln - Mississauga
Active
Interior renovation project located at 1020 Johnsons Ln, Mississauga, and it involves new flooring, office rooms, lighting, kitchen cabinetry.
Anticipated start date is sometime in October 2025.
Bell - 9 Channel Nine Crt, Scarborough
Active
Three small projects packaged into one located at 9 Channel Nine Ct, Scarborough, involving mechanical and electrical work regarding AC units.
NBLY - New Pharmacy - Port Elgin
Active
Located at 17 East Main Street, Port Elgin, NB E4M 2X8, the existing 1,939 SF building is being converted to a new pharmacy. The renovation includes new wall partitions, ceiling, flooring, trims, doors, interior window, sink, and light fixtures.
The anticipated start date is TBD, but it's as soon as possible.
The anticipated start date is TBD, but it's as soon as possible.
WK Kellogg's Belleville - Zinnia
Active
This project located at 501 College St, Belleville, ON involves new wall partitions, ceilings, wall tiles, millwork, painting, washroom accessories, and column protectors installations.
The anticipated start date is November 2025.
The anticipated start date is November 2025.
Skills for Change - 791 St Clair Ave W, Toronto - Retrofit
Active
The project is a retrofit/renovation of a 2-storey plus basement level training school for Skills for Change at their main facility at 791 St Clair Ave W, Toronto, ON M6G 3P8.
Walmart 1151 - Sheridan - Mall Door Closure
Active
The project's primary objective is to permanently close the internal mall access point to the Walmart store located at North York Sheridan Mall, 2202 Jane St, North York, ON. This involves the demolition of the existing entrance and the construction of a new, fire-rated exit corridor, along with all associated electrical, mechanical, and fire protection modifications.
The anticipated start date is November 3, 2025.
The anticipated start date is November 3, 2025.
Region of Peel - Peel Living Common Area Reno
Active
The project is the interior renovation of the common areas (party rooms, washrooms, laundry) of 5 Peel Living properties. The renovation includes replacement of flooring, wall base, painting, doors, exhaust fans, heaters, lighting, and partition walls.
Locations:
> 4 Caroline St., Mississauga
> 35 Stavebank Road North, Mississauga
> 1745 Dundas Street East, Mississauga
> 66 King St. West, Mississauga
> 1 Knight bridge Road, Brampton
The work is expected to be done over the winter and to substantially complete by April 2026.
Locations:
> 4 Caroline St., Mississauga
> 35 Stavebank Road North, Mississauga
> 1745 Dundas Street East, Mississauga
> 66 King St. West, Mississauga
> 1 Knight bridge Road, Brampton
The work is expected to be done over the winter and to substantially complete by April 2026.
The Finery - 22 Cannon St., Hamilton
Active
The project is a commercial retrofit at of an existing 63,000 SF 4-storey building located at 22 Cannon St E, Hamilton. The scope of work include: rooftop addition of mech room, new MEP, new roofing, white box interiors ready for tenant outfits, freight elevator replacement for passenger, new building entryway of suspended slab, stair and ramp, window replacement, landscaping.
Anticipated start date is spring 2026 with a target completion for summer 2027.
Anticipated start date is spring 2026 with a target completion for summer 2027.
Toronto Zoo RFT 32 - Constn of Red Panda Habitat
Active
This project includes demolition of an existing structure and the construction of a new, state-of-the-art facility designed to enhance the well-being of the red pandas and improve visitor experience at the project location at 2000 Meadowvale Rd, Toronto.
Anticipated start date is TBD.
WM FY26 Part-Paving Project at 3659 Moncton, NB
Active
Part-paving project of the parking lot at the Walmart store located at 25 Plaza Blvd, Moncton, NB E1C 0E8.
Expected start date is end of July 2025, and there are 11 work phases.
Walmart RTU - Antigonish, NS
Active
Replacement of rooftop units at the Walmart store located at 50 Market St, Antigonish, NS B2G 3B4.
Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
PCO GTA 5825 Kennedy Rd, Mississauga
Active
Office renovation project to add new proposed offices and open offices at 5825 Kennedy Rd, Mississauga, ON L4Z 2G3. The scope of work includes carpet replacement, new partitions, painting, electrical, and HVAC modifications.
Start date is still to be determined.
BGIS - 330UA Signage Permanent Scope - Toronto
Active
The project is the replacement of existing signs throughout the basement, 5th floor, 7th floor, 8th floor, and 9th floor of the Canada Life Building at 330 University Ave, Toronto, ON M5G 1R8. Work is to be completed after regular business hours.
Expected start date is July 2025.
BGIS - London CACC
Active
HVAC renovation project located at 1510 Woodcock St, London, ON N6H 5S1. The scope of work includes repair and upgrade all items required in TSA Inspection to lift the no-fill order, install a new 8-tonne cooling unit to create full redundancy, and supplying and installing one 6-ton outdoor unit. Work is to be completed after regular business hours.
Expected start date is July 2025.
BGIS-Bell - 76 Adelaide - Boiler Heating System (IWG)
Active
Project involves the installation of a new heat recovery chiller system, including the removal of a decommissioned chiller and the installation of new pre-purchased heat pump units.
The expected start date is still to be determined, but it is targeted to begin as soon as possible upon project award.
Dollar Tree - Edmonton
Active
Tenant fit-out of a new Dollar Tree store (approx. 10,116 square feet) located at 13629 St Albert Trail NW, Edmonton, AB T5L 5E7.
Expected start date is September 11, 2025. Expected completion date is November 2, 2025.
Walmart RTU - Gatineau, QC
Active
Replacement of rooftop units at the Walmart store located at 425 Boulevard Saint-Joseph #1,
Gatineau, QC J8Y 3Z9. Project is set to begin sometime in May/June 2025 and end on July/August 2025.
Work needs to be completed after store hours.
Walmart RTU - Quebec City, QC
Active
Replacement of rooftop units at the Walmart store located at 1700 Bd Lebourgneuf, Québec, QC G2K
2M4. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
Walmart RTU - Edmonton, AB
Active
Replacement of rooftop units at the Walmart store located at Northgate Center, 9499 137 Ave NW,
Edmonton, AB T5E 5R8. Project is set to begin sometime in May/June 2025 and end on July/August 2025.
Work needs to be completed after store hours.
Walmart RTU - Selkirk, MB
Active
Replacement of rooftop units at the Walmart store located at 1016 Manitoba Ave, Selkirk, MB R1A 4M1.
Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs to be
completed after store hours.
Walmart RTU - Powell River, BC
Active
Replacement of rooftop units at the Walmart store located at 1. 7100 Alberni St, Powell River, BC
V8A 3G7. Project is set to begin sometime in May/June 2025 and end on July/August 2025. Work needs
to be completed after store hours.
Thales Palladium
Active
Thales is looking to consolidate its footprint in Ottawa where it currently has three leases across
two addresses, Thales has leased 500 Palladium Dr. for this purpose. Thales is intending to complete
tenant improvements of the new space improving the facilities for all of Thales employees in the
National Capital region. The general contractor will conduct fit-out will comprise of demolition,
engineered structure re-enforcements, partition construction, environmental upgrades, supply of all
materials, and finishing of the 2-story floor space.
Walmart - 1068 Peace River Perimeter Fencing Project
Active
Chainlink fencing required for the Walmart store located at 9701 78 St, Peace River, AB T8S 2A1.
HWDSB - Westdale Secondary School Changeroom Renovation
Active
Renovation of changerooms at Westdale Secondary School at 700 Main St W, Hamilton, ON L8S
1A5. The project involves constructing two student group changerooms, three single-occupant
changerooms, and a staff room in the basement, along with related mechanical, electrical,
and structural work, including demolition, plumbing, and finishes. Key milestones include a
site walkthrough on April 3, 2025, tender submission by April 15, 2025, and construction
from June 30 to December 12, 2025.
Walmart - 1025 Matane - Exterior Painting
Active
Exterior painting project located at 150 Rue Piuze, Matane, QC G4W 4T2. The work
includes exterior painting, signage replacement (supplied by Pattison ID), roof cap
flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco canopy
above the main entrance to be done after store hours.
Walmart - 1028 Drumheller - Exterior Painting
Active
Exterior painting project located at 1801 S Railway Ave, Drumheller, AB T0J 0Y0. The
work includes exterior painting, signage replacement (supplied by Pattison ID), roof
cap flashing (by Walmart-approved roofing contractor), and caulking. Work on stucco
canopy above the main entrance to be done after store hours.
Peel Living - Interior Renovations at Various Peel Living Residential Properties
Active
Project involves the interior renovations of three residential properties (Bella
Vista Place, Mason’s Landing, and Walker Road). The scope includes renovating
common areas such as lobbies, corridors, stairwells, and garbage rooms by
replacing flooring and wall tiles, repainting surfaces, installing signage, and
addressing potential asbestos/mold abatement. Substantial completion by January
31, 2026, and final completion by May 31, 2026.
UofT - Upper Burwash WR - PH1 Middle House WR Reno
Active
"This project consists of the Retrofit, Renewal and Renovations of 18 Washrooms at the Basement and 3 upper levels in the Upper Burwash Residences, Middle House located at 73 Queen's Park Cres E, Toronto, ON.
The work is intended to commence in the 4th week of May 2025 and be completed, ready for full Occupancy, by August 7, 2025 ."
Peel Living - Exhaust Fan Replacement
Active
The project involes the replacement of the exhaust fans and ducts at two Peel Living properties located at 5955 Creditview Road, Mississauga, ON L5V 1N4 and 1 Knightsbridge Road, Brampton, ON L6T 4B7.
Hyundai - Washroom Accessibility Upgrades - Markham
Active
Comprehensive accessibility upgrades to the male and female washrooms on both the first and second floors at 75 Frontenac Drive, Markham, ON.
Expected start date is on Monday, July 7, 2025.
Dollar Tree - Arnprior Gate Centre - Tenant Fit-Up
Active
Tenant fit-out and renovation of a 9,414 SF Dollar Tree store at 245 Daniel St. S., Arnprior, ON within the existing Arnprior Commercial Centre.
Expected start date is end of July 2025.
Cavalieri - 2510 & 2520 Speers Rd. Oakville
Active
The project involves the interior fit-out of two single-story industrial buildings including demising walls and all related mechanical, electrical, and sprinkler systems. Building A (2510 Speers Rd) is planned to contain six (6) suites of approximately 4,500 sq. ft. each. Building B (2520 Speers Rd) is planned to contain four (4) suites of approximately 2,000 sq. ft. each. Both buildings are currently empty except for the electrical and mechanical room.
Work is scheduled to start summer 2025.
WRHN - Waterloo Regional Parking Lot
Active
This project involves the expansion of the existing parking lot at the Chicopee Campus (formerly GRH Freeport) in 3570 King St E, Kitchener, ON N2A 2W6.
The project requires phased construction to maintain two access lanes and limit payment booth downtime to two weeks, with strict adherence to a milestone schedule targeting substantial completion by September 8, 2025.
T250030 - Gurudwara SAHIB - Durham Region
Active
This project involves the construction of a new two-story, 378 m² (approx. 4,070 sq ft) New Community Centre at 1410 Stevenson Road North in Oshawa, Ontario. The scope includes the demolition of an existing one-story building, comprehensive site work, and the construction of the new steel-frame facility, which features distinct architectural elements like three fiberglass roof domes.
Peel Living - Ceiling and Lighting Replacement - Castle Brooke
Active
The project involves the comprehensive replacement of existing ceiling tiles and lighting systems at Castelbrooke (2590 Rugby Road, Mississauga), including demolition of suspended metal grids and acoustical tiles in specified areas (basement, ground floor, levels 2–10, and level 11), installation of new Armstrong Calla ceiling tiles with Prelude XL grid systems, and upgrading lighting fixtures while reusing existing electrical circuits. Work includes relocating salvaged fixtures to designated mechanical/electrical rooms, adding mid-landing stair lighting, reinstating fire-rated assemblies with compliant fire-stopping materials, and repainting affected surfaces.
The project requires substantial completion by June 9, 2025, final completion by June 16, 2025,
The project requires substantial completion by June 9, 2025, final completion by June 16, 2025,
Walmart - 3122 Belleville - Washroom Replacement
Active
Washroom renovation of the Walmart store located at 274 Millennium Pkwy, Belleville, ON K8N 4Z5. Scope of work includes demolition, drywall, electrical, flooring, tiles, millwork, painting, and plumbing.
Commencement sometime on May 2025 with a substantial completion on July 11, 2025.
Commencement sometime on May 2025 with a substantial completion on July 11, 2025.
HWDSB - Hess Street Elementary Floor and RTU
Closed
Project description...
HWDSB - Lisgar Elen School Music Rm Reno & Exterior Door Replacement
Closed
Project description...
(GWNCC) Haldimand County - replace and Repair Concrete Curb, Sidewalk and
Catchbasiins
Closed
Project description...
Cavalieri -Self Storage - 7845 Hwy 27 Phase 2
Closed
Project description...
Walmart - FY26 Parking Lot (ON)
Closed
Project description...
GTAA Project 14062 New Offices
Closed
Project description...